Highway/Elevated Superstructure Demolition

Marquette Interchange

Omega completed demolition of the Milwaukee Interchange through a very aggressive schedule.

Learn More

Cline Avenue

Omega demolished over 2 miles of elevated concrete box girders and was wrecked with crane and wrecking ball, explosives, and hydraulic excavators. This work was performed over roadways, navigable waters, and railroad tracks.

Learn More

Wacker Drive Reconstruction Project

This project consisted of the complete removal of Wacker Drive between State Street and Wells Street located between the Chicago River and Chicago high-rise buildings.